There was a significant amount of temperature sensitive merchandise stored onsite by this client. Scheduling a shutdown at a time that allowed this merchandise to remain within tight temperature tolerances required careful planning. Integration with two layers of backup generators designed to keep the essential services running was an interesting piece of work. Another job well done by the team to deliver this project to an excellent standard while maintaining our impeccable safety standard.